Skip Ribbon Commands
Skip to main content
NWC Home

NWC Home

 Services Fees


Fees of connecting water lines:​

​ Installation fees*​
Basic Connection Fees SAR 150 per building
Additional connection fees SAR 50 per each additional unit in the building​

 

Water Meter ​Insurance:​*
Gauge diameter (inch)
0.50​ 0.75​ 1​ 1.25​ 1.50​ 2​ 4​ 6​
Amount (SAR)​
250​ 400​ 550​ 650​ 800​ 1100​ 2400​ 5000​

*All above fees are imposed by Ministerial resolution no. 1/503 dated 11/6/1432h regarding the connection of water lines.   Please refer to resolution 1/503 for further information.​ 


Fees for connecting sewage lines:​

Diameter ​

  Fees for connecting sewage lines to houses (SAR)​ *   

Less than 625 m More than 625 m Additional fees for each unit​
Additional fees for each unit150 mm​ 2300 SAR​ 3000 SAR​ 200 SAR​
200 mm​ 5000 SAR​ 5000 SAR​ 200 SAR​
300 mm​ 20,000 SAR​ 20,000 SAR​ 200 SAR​​

*All above fees are imposed by Ministerial resolution no. 264 dated 26/10/1426h regarding the connection of sewage lines. Please refer to resolution 264 for more information.


Diameter  Fees for connecting sewage lines to government, commercial, or industrial sectors 
Fees for connecting sewage lines to building Additional fees per square meter
150 mm​ 15,000 SAR 4 SAR
200 mm​ 30,000 SAR 4 SAR
300 mm​ 60,000 SAR 4 SAR

​